Vermont Public is independent, community-supported media, serving Vermont with trusted, relevant and essential information. We share stories that bring people together, from every corner of our region. New to Vermont Public? Start here.

© 2024 Vermont Public | 365 Troy Ave. Colchester, VT 05446

Public Files:
WVTI · WOXM · WVBA · WVNK · WVTQ · WVTX
WVPR · WRVT · WOXR · WNCH · WVPA
WVPS · WVXR · WETK · WVTB · WVER
WVER-FM · WVLR-FM · WBTN-FM

For assistance accessing our public files, please contact hello@vermontpublic.org or call 802-655-9451.
Play Live Radio
Next Up:
0:00
0:00
0:00 0:00
Available On Air Stations

E4 | Lexington Modern | Engineered for Accessibility

Season 45 Episode 4 | 23m 42s

Great progress is being made on the project house. The primary addition is being framed and the rooms are starting to take shape. A sound deadening wall is built. A lally column is removed and a larger ridge beam is installed to create an open kitchen and dining area. The homeowners choose hardscape finishes based on 3D renderings. An accessible designed bathroom is toured.

Aired: 10/18/23 | Expires: 11/02/23
Funding for THIS OLD HOUSE is provided by The Home Depot.
Extras
A concrete block wall is built to connect the new mechanical space out front to the old.
Construction began on the Lexington project. A new energy code affects the construction.
Life After Sandy- Storm Stories from the Jersey Shore
Storm stories from the Jersey Shore
Life After Sandy- Storm Stories from the Jersey Shore
Life After Sandy- Storm Stories from the Jersey Shore
Life After Sandy- Storm Stories from the Jersey Shore
Life After Sandy- Storm Stories from the Jersey Shore
Life After Sandy- Storm Stories from the Jersey Shore
Storm stories from the Jersey Shore
Latest Episodes
All
  • All
  • Lexington / Glen Ridge
  • Atlanta / Newburyport / Ipswich
  • Concord Country Cape
  • Seaside Victorian Cottage
  • This Old House
  • Jamestown Net-Zero House
  • This Old House
  • This Old House Season 36
  • This Old House Season 35
A new brick walkway and wood fiber insulation are installed. ERVs and HRVs are discussed.
A custom jamb and threshold are built. Various water-resistive barriers are compared.
A trip is taken to the Empire State Building and the new plumbing system is discussed.
The new two-story addition is framed, and plumbing pipes are isolated from cold weather.
Termite damage is discovered. A high school student works as a framer on the project.
Work begins on the 1887 Victorian to make it suitable for multigenerational living.
A new project begins - an 1887 Victorian being renovated for multigenerational living.
The accessible renovation of the mid-century modern home in Lexington, MA is complete.
A final review of the geothermal system is done, and a blower door test is performed.
The homeowners sit down for an interview about their son and Duchenne muscular dystrophy.